Here at MTC Contractors we are leading the way in reducing the downtime of your fleet with the development of our Armour Coat Hydraulic Looms. We currently supply a leading gold mine with these custom-made looms, and there has been significant reduction in hose failures on their DD421 fleet. The maintenance time has reduced significantly as well, with whole-loom change-outs being a safer, more efficient way of maintaining the hydraulics on the twin booms.
With the current trials being successful and the roll out of standardizing a fleet of drills to Armour Coat Hydraulic Looms, our clients will reduce their service times from 24hrs to 12hrs every 14 days.
Armour Coat Hydraulic Looms projected forecast:
Average headings per drill per 12hr shift (1) 4.4m advanced development
26 eliminated (12-hour shifts) per year
4.4m x 26 = 114m per year per drill
Total drills onsite x 6 - 6 x 114 = 686m
TOTAL: 686m advanced development meters gained in a single year
TOTAL: percussion hours: 225hr
Armour Coat Hydraulic Looms provide their clients with low maintenance, complete sealed hydraulic looms that are oil and chemical resistant, crush resistant and abrasive resistant which will rapidly reduce your service times and machine downtimes which also reduces working in high risk areas.
Established in 2017, MTC Contractors is the culmination of many years in the Mining & Tunnelling industries.
Our team carries a vast depth of knowledge and hands on experience within the mining industry.